


Project Info
Client
Ministry of Housing
Status
Completed
Location
Al-BAHA City, Saudi Arabia
Contractor
Asala Al Khaleej Real Estate
Project Value
SAR 12.5 Million
Project Duration
14 months
Completion Date
June 2023
Project Overview
The Construction of 5 Villas project was a landmark residential development undertaken by El-Masa El Zahabia Contracting Company in partnership with Asala Al Khaleej Real Estate. Located in Al-BAHA City, this project was commissioned by the Ministry of Housing to provide high-quality, modern homes that cater to the needs of Saudi families. Each villa was designed and built with meticulous attention to detail, combining functionality, aesthetics, and sustainability.
Scope of Work
The project scope covered all aspects of villa construction, including:
- Civil Works: Excavation, foundation laying, and structural construction for all five villas.
- Architectural Design: Implementation of modern yet culturally appropriate designs.
- Electrical Works: Installation of electrical wiring, lighting systems, and power outlets.
- Mechanical Works: Plumbing, HVAC (heating, ventilation, and air conditioning) systems, and water supply connections.
- Interior Finishing: High-quality tiling, painting, carpentry, and ceiling works.
- Landscaping: Development of outdoor spaces, including gardens, walkways, and driveways.
- Smart Home Features: Integration of modern smart technologies for enhanced living experiences.

Key Features of the Villas
- Design: Contemporary architectural design with spacious layouts, large windows for natural light, and premium finishes.
- Size: Each villa spans approximately 400 square meters, including 4 bedrooms, 5 bathrooms, a living room, dining area, kitchen, and maid’s quarters.
- Energy Efficiency: Use of energy-efficient materials and systems, including LED lighting and insulated walls.
- Sustainability: Incorporation of water-saving fixtures and environmentally friendly building materials.
- Outdoor Spaces: Private gardens, car parking spaces, and recreational areas for family gatherings.
Benefits Delivered
- High-Quality Housing: Delivered modern, luxurious homes that meet the highest standards of quality and comfort.
- Enhanced Living Experience: Designed to cater to the lifestyle needs of Saudi families, with spacious interiors and outdoor areas.
- Sustainable Design: Energy-efficient and environmentally friendly features reduce operational costs and environmental impact.
- Community Development: Contributed to the Ministry of Housing’s mission to provide affordable, high-quality housing for Saudi citizens.

Structural Details
- Foundation Type: Reinforced concrete strip and pad foundations
- Structural System: Reinforced concrete frame with load-bearing walls
- Floor Systems: Reinforced concrete slabs with thermal insulation
- Wall Construction: Double-wall system with thermal and acoustic insulation
- Roof Construction: Flat roof with waterproofing membrane and thermal insulation
- Seismic Design: Compliant with Saudi Building Code for seismic zone requirements
Materials Used
- 1,850 cubic meters of concrete (Grade 30/37)
- 210 tons of reinforcement steel
- 38,500 concrete blocks for wall construction
- 4,200 square meters of ceramic and porcelain tiles
- 3,600 square meters of paint (low-VOC environmentally friendly)
- 850 square meters of natural stone cladding
- 125 doors (solid wood and hollow core)
- 185 windows (double-glazed aluminum frames)
Project Timeline Milestones
- Month 1-2: Site preparation and foundation work
- Month 3-6: Structural framework and exterior walls
- Month 7-9: Roofing, MEP rough-ins, and exterior finishes
- Month 10-12: Interior finishes, cabinetry, and fixture installation
- Month 13-14: Landscaping, final touches, and handover
Community Impact
- Employment of 85 local workers throughout the project
- Sourcing of 70% of materials from Saudi suppliers
- Training program for 12 recent engineering graduates
- Implementation of waste management plan with 65% recycling rate
About Company