Project Info
Client
Amiral Saudi Aramco
Status
Completed
Location
Amiral Saudi Aramco
Contractor
Saudi Power Lines
Project Value
650,000 SAR
Project Duration
6 months
Completion Date
February 2024
Project Overview
The Construction of Fire Water Pump project was undertaken by El‑Masa El Zahabia Contracting Company to deliver a fully compliant firefighting system to Saudi Aramco. Fire water pumps are widely used in Saudi Aramco projects due to their critical role in firefighting operations, ensuring reliable high‑pressure water supply, rapid emergency response, and continuous protection of industrial facilities.
Scope of Work
We provide end‑to‑end construction and installation of complete fire water pump systems, including:
- Fire pump room construction
- Main, standby, and jockey pump installation
- Suction and discharge piping networks
- Electrical power and control systems
- Testing, commissioning
System Components
Fire Pumps
- Electric‑driven and diesel‑driven pumps
- UL/FM‑approved equipment
- Designed to meet required flow and pressure demands
Jockey Pump
- Maintains system pressure
- Prevents unnecessary main pump operation
Controllers & Electrical Systems
- Fire pump controllers (electric & diesel)
- Dedicated power feeders
- Integration with fire alarm and building management systems
Piping & Valves
- Suction and discharge manifolds
- Check valves, gate valves, pressure gauges
- Test header for flow testing
Construction & Installation
Our construction process ensures long‑term reliability and compliance:
- Precision pump alignment and grouting
- Fuel system and exhaust installation for diesel pumps
- Fire‑rated cabling and electrical segregation
Testing & Commissioning
We perform comprehensive testing to verify system performance:
- Automatic start on pressure drop
- No‑flow (shutoff) pressure test
- Full flow test to validate pump curve
- Diesel engine performance and safety checks
- System integration with fire alarm and BMS
Deliverables
Upon completion, clients receive:
- As‑built drawings
- Pump performance curves
- Test and commissioning reports
- Operation & Maintenance manuals
- Civil Defense approval certificate
Commitment to Safety & Quality
Every fire water pump project is executed with strict adherence to NFPA 20, NFPA 13, NFPA 25, and local authority regulations. Our focus on quality, precision, and reliability ensures that your facility is protected by a system built to perform when it matters most.