Constructing Fire Water Pump Amiral Jubail

Home ProjectsConstructing Fire Water Pump Amiral Jubail

Project Info

Client

Amiral Saudi Aramco

Status

Completed

Location

Amiral Saudi Aramco

Contractor

Saudi Power Lines

Project Value

650,000 SAR

Project Duration

6 months

Completion Date

February 2024

Project Overview

The Construction of Fire Water Pump project was undertaken by El‑Masa El Zahabia Contracting Company to deliver a fully compliant firefighting system to Saudi Aramco. Fire water pumps are widely used in Saudi Aramco projects due to their critical role in firefighting operations, ensuring reliable high‑pressure water supply, rapid emergency response, and continuous protection of industrial facilities.

Scope of Work

We provide end‑to‑end construction and installation of complete fire water pump systems, including:

  • Fire pump room construction
  • Main, standby, and jockey pump installation
  • Suction and discharge piping networks
  • Electrical power and control systems
  • Testing, commissioning

System Components

Fire Pumps

  • Electric‑driven and diesel‑driven pumps
  • UL/FM‑approved equipment
  • Designed to meet required flow and pressure demands

Jockey Pump

  • Maintains system pressure
  • Prevents unnecessary main pump operation

Controllers & Electrical Systems

  • Fire pump controllers (electric & diesel)
  • Dedicated power feeders
  • Integration with fire alarm and building management systems

Piping & Valves

    • Suction and discharge manifolds
    • Check valves, gate valves, pressure gauges
    • Test header for flow testing

Construction & Installation

Our construction process ensures long‑term reliability and compliance:

    • Precision pump alignment and grouting
    • Fuel system and exhaust installation for diesel pumps
    • Fire‑rated cabling and electrical segregation

Testing & Commissioning

We perform comprehensive testing to verify system performance:

  • Automatic start on pressure drop
  • No‑flow (shutoff) pressure test
  • Full flow test to validate pump curve
  • Diesel engine performance and safety checks
  • System integration with fire alarm and BMS

Deliverables

Upon completion, clients receive:

    • As‑built drawings
    • Pump performance curves
    • Test and commissioning reports
    • Operation & Maintenance manuals
    • Civil Defense approval certificate

Commitment to Safety & Quality

Every fire water pump project is executed with strict adherence to NFPA 20, NFPA 13, NFPA 25, and local authority regulations. Our focus on quality, precision, and reliability ensures that your facility is protected by a system built to perform when it matters most.